logo logo logo
Vai alla versione Italiana
 

Photographic gallery

Talod Dome

 
View of the camp from high The camp after the winter Caterpillars after the winter
Tent and AWS Landing at the camp View of the camp
Life containers Flags Digging of the trench
Assembling of the cover Cover of the trench Entrance of the trench
Assembly of a tent Digging of the tight trench The slide in the trench
First carrot Carrot Extraction of the carrot from the drill
Carrots' cut Control panels Deep : 1000 meters
The camp in the storm White out January 2007 : 1300 meters